Site Preparation For Sheds, Cabins, & Tiny Houses

Set the Foundation for a Smooth Delivery

Preparing your site properly helps protect your investment and ensures a smooth, on-time delivery. Whether you’re setting up a shed, cabin, or tiny house, we’re here to help every step of the way.

The info is in the PDF's here, but it might be easier to see/understand on the webpage below.

Shed Site Preparation

Crushed Stone Pad for Sheds

For sheds and small buildings, we recommend a crushed stone pad built 2 feet larger than your structure in both directions.
Choose from:

  • Standard Pad: Leveled stone base

  • Deluxe Pad: Stone pad with treated 4×4 wood border for added definition

This setup ensures stability, drainage, and minimizes dirt splash or moisture problems.

Cabin & Concrete Foundations

Cabins and large structures often require a concrete foundation.Make sure to:

  • Choose a clear, level site

  • Pour a frost-protected concrete pad if local code requires

  • Obtain necessary permits (customer responsibility)

We do not level foundations on-site. This must be completed before delivery.

Concrete Pad (“Cookie”) Foundation for Sheds

A simple option for smaller buildings:

  • Use 8″x16″x2″ concrete blocks under each skid

  • One block at each end, and every 4 feet between

  • Place on firm, level soil or gravel

Tiny House Foundation Guidelines

Special Requirements for Tiny Houses

For long-term durability and code compliance, a proper foundation is required for tiny houses.

  • A concrete foundation must be installed before delivery

  • Install sill sealer and a sill plate, fastened securely

  • Keep anchor bolts at least 4 inches in from all edges

  • Add gravel at both gable ends and around the building for shed mule access—failure to do so may incur additional fees if delivery is delayed or equipment gets stuck

  • Your foundation contractor should call us before beginning work to ensure the specs are aligned

Note: Customers are responsible for tie-downs and skirting after the building is placed. For an additional fee, we may assist.
Just call for pricing.

Site Prep Checklist

  • ✅ Clear, level ground

  • ✅ Foundation ready before delivery

  • ✅ 6–8 ft access path around structure

  • ✅ Permits approved (if required)

  • ✅ Delivery path prepared with gravel (for cabins/tiny homes)

We’re happy to walk you through every step to ensure your site is ready and your experience is a great one.